Electrical work was carried out throughout the building.

Until now, we were only able to sign up for a maximum of 30A, and there were several times when the breaker would trip in the middle of winter.


Therefore, we have recently carried out major electrical work on the 3rd, 4th, and 5th floors, which will ensure a capacity of 40A x 2 = 80A in all rooms.


This means that there will likely be no power outages even in the middle of winter (or summer).